PAVING AND DRAINAGE OF UTG SUL CAPIXABA

Main Services Provided

Asphalt paving of the premises

  • 57.000m² de área interna

Asphalt paving

  • 40.000m² of the access roads

Laying

  • of 1,000.00 m 150 mm to 300 mm DN cast iron pipe for Contaminated Network

Laying

  • of 1,200.00 m 100 mm to 300 mm DN cast iron pipe for Oleaginous Network